Code Update | Electrical Estimator | On Time Estimating, Inc. | United States

Visit

11523 Palm Brush Tr.

Suite 205

Bradenton, FL. 34202

Call

T: 844-999-OTEBIDS (6832)(800) 816-9130 Ext. 1

  • Instagram Social Icon
  • Twitter Social Icon
  • LinkedIn Social Icon
  • Facebook Social Icon
  • Google+ Social Icon
  • Pinterest Social Icon

2016 On Time Estimating, Inc.

October 15, 2019

June 25, 2019

March 14, 2019

November 27, 2018

November 6, 2018

September 12, 2018

Please reload

Recent Posts

Estimate Won! - 144 Room Hotel

June 13, 2016

1/2
Please reload

Featured Posts

Code Update

July 17, 2016

 

 New Jersey scheduled to adopt the 2011 NEC.

New Jersey is scheduled to adopt the 2011 NEC on 5/7/12 with modifications. The modications can be found in the UCC . There will be a six month grace period where the applicant can apply for the permit under the 2008 NEC. The grace period expires 11/7/12 at which time all new permit applications will be issued under the 2011 NEC. Any work performed on existing structures will still fall under the ReHab SubCode and the 2008 NEC.

  • Like

__________________
www.electures.biz
www.njeg.org
www.sjeia.org
www.iaeisj.org

Please reload

Follow Us
Please reload

Search By Tags
Please reload